Poles

KO

- anchoring grid with base plate

Usage

The base of the flanged poles to be poured with concrete mix is made so that the slab of the grid is as horizontal as possible. Concreting will be done so that the concrete does not overhang the bottom edge of the base slab. When concreting, it is necessary to consider the creation of channels for easy passage of cables and an opening for condensate drainage

Surface treatment

without surface treatment - in concrete

Design

Welded with fixed knots, base plate with large hole, sufficiently long threads for convenient installationSections are square, circular, n-angular4-8 passesadaptations possible according to customer requirements

Accessories

washers and nuts for strength

Variants

Kód Cena
300 žárový zinek M20 3000-6000 9,6 0,4 300 10 240 400
400 žárový zinek M24 6000-10000 18,1 0,6 400 15 300 600
500 žárový zinek M30 10000-15000 37,0 1,1 500 20 400 1000
600 žárový zinek M36 15000-20000 52,0 1,4 600 30 500 1000

Where to find us

Kooperativa vod družstvo

+420 327 551 440
+420 327 551 464
info@kooperativa-vod.cz

Sázavská 504
285 04 Uhlířské Janovice

IČ: 00028525, DIČ: CZ00028525
č. účtu CZK: 416-161/0100
Zapsané v obchodním rejstříku vedeném Městským soudem v Praze, oddíl DrXCIX, vložka 696
Czech republic

Na Letišti 147
75002 Bochoř-Přerov 2
Czech republic
mapa

Pro projektanty